Location
Spartanburg, SC
Completed
2013
Added SF
33,981
Renovated SF
15,370
Auditorium Seating
1,611 seats
When plans for Cornerstone Baptist Church’s renovation stalled due to unexpected development costs, we came up with a solution to utilize their existing location and allow the necessary expansion of their worship capacity by demolishing the old code-deficient building and constructing a new auditorium with a balcony.
When a portion of the ceiling was removed from the older part of the existing building adjacent to the new auditorium during schematic design, a unique exposed wood truss system and roof deck were discovered. We exposed this previously hidden structure and turned the area into a connecting concourse to serve the new auditorium.