The existing 100-year-old facility had added parking areas on the west side of the building as an adjacent lot became available over time. This area eventually turned into the main parking lot for the entire facility, but without a real entrance on that side of the building, we improved the buildings, curb-appeal, and provided a monumental entrance that creates a centralized entry and welcome point for the congregation. The ceiling in the 100-year-old auditorium was found to be falling, and this led to a major renovation project in the auditorium as well.